lock chamber
英 [lɒk ˈtʃeɪmbə(r)]
美 [lɑːk ˈtʃeɪmbər]
网络 闸室
英英释义
noun
- enclosure consisting of a section of canal that can be closed to control the water level
双语例句
- Besides, many affecting factors, such as lock chamber dimensions, lock valve conditions and single or multi flight lock situations have been discussed.
文中讨论了影响选型的诸多因素,如闸室平面尺寸、输水阀门工作条件、单级或多级船闸的影响等。 - Analysis of vibrating effect of blasting demolition of spillway lock chamber near dilapidated house
危房附近溢洪道闸室的拆爆振动效应分析 - Discussion on lock gate superimposing float chamber
船闸闸门增设浮箱问题的探讨 - The realizable κ~ε turbulent model was used to carry out the unsteady calculation about the simulation system which was composed by batch handling lock hopper and scrubbing cooling chamber. The result of numerical simulation agrees well with the operation value.
在由间歇排渣型锁斗和洗涤冷却室组成的模拟系统中,应用Realizableκ~ε湍流模型进行了非稳态计算,得到的计算结果和实际情况比较吻合。 - Substitutes have been suggested& utility hole and air lock serving as a decompression chamber for workers. But Thiessen said those references will be left alone to avoid confusion.
有人提议用故障排查洞和给工人减压的气闸来替换上述两个词,但狄森表示不会采纳这些参考意见以免引起人们的困惑。 - In the course of filling of Mashi Lock, a lot of air from the valve well comes into the culvert so as to produce many big air bubbles in the chamber, which is dangerous to the passing ships.
麻石船闸在灌水过程中,输水廊道的阀门井处大量进气。空气经廊道进入闸室,在闸室中形成大气泡,威胁过闸船舶安全。 - The going forward and back of flaw-detecting system is controlled by the lock gear inner the chamber, and its velocity is adjusted by it.
膛内定位机构控制系统前进与后退及调整运动速度。 - The calculation methods of lock chamber wall are mostly approximate with many assumptions, which still need proving both by theory and experiments.
对于岩基上船闸闸室墙的计算方法大多均是作了许多假定不完善的近似方法,其假定是否成立仍需在理论、实验上进一步探讨。 - Based on the structure inner force calculation and analysis, emphasis on the development of the lock chamber reinforced concrete structure reinforcement design program, the reinforcement design intelligent and interactive is achieved.
在结构内力计算分析的基础上,重点进行船闸闸室钢筋混凝土结构的配筋设计程序的编制,实现配筋设计智能化和交互性。 - Horizontal displacement moves to the ship lock chamber, the maximum deformation is 26.14 mm. With the end of excavation the deformation approximately trends to be stable, and at present the deep rock mass of high slope is in the steady condition.
岩体水平向位移表现为向闸室方向,最大变形为26.14mm,随着开挖的结束,变形基本趋于稳定,目前高边坡深层岩体处于稳定状态。